“Olgino” GTP-CHP
Location: Moscow region, the town of Zheleznodorozhny, the residential area “Olgino”
The electric power. The first stage of a project: 21.6MW
The heat power. The first stage of a project: 86.3MW
The electric power. The second stage of a project: 45.0MW
The heat power. The second stage of a project: 120.0MW
The basic equipment. The first stage of a project:
− 4 gas-turbine power generation units of the brand TAURUS 60, production Solar Turbines, USA;
− 4 hot-water waste heat exchangers 9,2/105, production OJSC “Machine-building factory of Podolsk”, Russia;
− 3 hot-water heating peak-load boilers of the brand VITOMAX-200 with the heat power 16.5MW each, production VIESSMANN, Germany.
The basic equipment. The second stage of a project:
− 3 gas-turbine power generation units of the brand TITAN 130, production Solar Turbines, USA.
The application: the heat and electric supply of the residential area “Olgino” and other residential areas of Zheleznodorozhny town.